Skip to content

Technology

Subordinate credit shouldn’t be a black box.

FOCAL FUNDING brings underwriting, senior-loan monitoring, allocation, servicing, and portfolio reporting into a single digital environment — starting with a current view of the whole portfolio.

app.focalfunding.com/portal
Screenshot of the FOCAL FUNDING investor dashboard: allocated and available capital, interest return grid, credit performance, attachment profile, and the loans-by-region map
Portfolio dashboard. Illustrative $500,000 investor facility — demonstration data.

Position-Level Detail

From the portfolio to a single position.

Every aggregate figure traces back to the individual subordinate positions behind it. Open any position for its collateral, senior A-note, attachment and detachment points, and status.

  • Collateral, borrower entity and business plan
  • The identified senior A-note and its payment status
  • Attachment, detachment and combined leverage
app.focalfunding.com/portal/loan
Illustrative FOCAL investor portal position page: property summary and map, senior A-note, attachment and detachment
One position, collateral first. Illustrative — demonstration data.

Documents

Loan and intercreditor documents, where supported.

Underlying loan and intercreditor documentation and reporting for a facility live in the platform, where made available under the applicable terms.

  • Facility, onboarding and payment documents in one library
  • Loan documents and intercreditor terms by position
  • Statements and reports as they are produced
app.focalfunding.com/documents
Screenshot of the FOCAL FUNDING investor portal’s documents library
Documents library. Illustrative portal — demonstration data.

Risk Analytics

Attachment, senior status, maturity, and composition.

The lenses applied at underwriting carry through to monitoring: where the portfolio attaches in the stack, how the senior loans behind it are performing, when positions mature, and what the book is made of.

  • Attachment profile across every position
  • Modelled portfolio loss under successive value declines
  • Concentration by product, property type and region
app.focalfunding.com/reporting/risk
Illustrative FOCAL FUNDING risk analytics showing attachment, senior-loan status, concentration, and product composition
Risk analytics. Illustrative portal — demonstration data.

Reporting

Facility and position information, centralized.

Portfolio-level and position-level reporting are built into the platform, so facility, position and senior-loan information sit in one place rather than in statements assembled after the fact.

  • Committed, drawn and available capital by facility
  • Interest returns by month, as a percentage or in dollars
  • Historic-versus-current comparison on every report
app.focalfunding.com/reporting/loan-portfolio
Screenshot of the FOCAL FUNDING investor portal’s position portfolio reporting screen: facility amount, attachment point, and combined LTV
Loan portfolio report. Illustrative portal — demonstration data.

Allocation Engine

Capital allocated to eligible positions, by defined criteria.

Committed capital is allocated across a facility’s funded portfolio of subordinate positions according to defined eligibility criteria — mapped to a spread of underlying positions, not placed behind a single borrower or property.

How one commitment moves through the platform

Illustrative example only
  1. Step 1

    Capital Partner

    A qualified capital partner commits capital to a FOCAL facility.

  2. Step 2

    FOCAL FUNDING

    FOCAL originates and acquires subordinate real-estate credit — second liens and B-notes/participations behind an identified senior A-note.

  3. Step 3

    Portfolio Allocation Engine

    Committed capital is allocated across the funded portfolio of subordinate positions.

$470,000 allocated across 10 subordinate positions

Position A$60,00012% of allocation
Position B$45,0009% of allocation
Position C$55,00011% of allocation
Position D$40,0008% of allocation
Position E$50,00010% of allocation
Position F$35,0007% of allocation
Position G$65,00013% of allocation
Position H$45,0009% of allocation
Position I$40,0008% of allocation
Position J$35,0007% of allocation

Illustrative example only. Actual allocations vary by facility, available subordinate- position supply, and investor terms. The 10 slices above sum to $470,000 — 94% of the $500,000 commitment — leaving $30,000 as available capital awaiting reallocation, which earns no interest while idle. Shown for illustration purposes; not an offer, a commitment, or an actual portfolio.

See the platform behind the portfolio.

Request access and we will take you through the platform on a call, to learn whether FOCAL FUNDING is a fit for your capital.